Sound to Olympics Trail Bridge (Phase 3)

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5



DESCRIPTION

The Sound to Olympics (STO) Bridge project consists of a pedestrian and bicycle overpass spanning SR305 connecting Knechtel Way with John Nelson Lane (near Vineyard Lane) and the STO Trail. The bridge would provide a mid-block crossing between Winslow Way and High School Road, providing safe, non-motorized access for all ages between neighborhoods and public destination routes on each side of the highway.

Neighborhoods and Destinations linked via Knechtel Crossing

ACTIVITY

  • At the June 12, 2018 Business Meeting, the City Council cancelled the STO Phase 3 project and removed the project from the CIP.
  • At the April 17, 2018 Study Session, the City Council terminated the design for the STO Phase 3 Pedestrian Bridge. The City Manager directed staff to return with alternative proposals within 30-days.
  • 4/3/18 Study Session Presentation
  • 1/9/18 -  The City Council reconsiders canceling the Sound to Olympics Trail (Bridge) project at their January 9, 2018 meeting. See Press Release dated 1/10/18.
  • 1/2/18 - The City Council canceled the STO Trail (Bridge) project at their 1/2/2018 meeting. January 2, 2018 presentation to City Council.
  • An online survey to gather opinions on the design of the bridge was open from September 4th through November 29, 2017.  
    • Survey results are here.  Survey comments are here.   

PROJECT NOTIFICATIONS

Select “NOTIFY ME” to subscribe to project notifications and select this project.

PRINT SCREEN

Title VI

The City of Bainbridge Island fully complies with Title VI of the Civil Rights Act of 1964 and related statues in all programs and activities. Those requiring disability accommodations and/or materials made available in alternate formats, please contact the City Clerk at 206-842-2545 or by email.