Sound to Olympics Trail Bridge (Phase 3)

Contact Us

  1. Mark Epstein, PLA
    Engineering Project Manager
    Email

    PH: 206-842-2016

    Staff Directory

Which bridge design do you like? ... Take survey here!


DESCRIPTION:


The Sound to Olympics (STO) Bridge project consists of a pedestrian and bicycle overpass spanning SR305 connecting Knechtel Way with John Nelson Lane (near Vineyard Lane) and the STO Trail.  The bridge would provide a mid-block crossing between Winslow Way and High School Road, providing safe, non-motorized access for all ages between neighborhoods and public destination routes on each side of the highway.

ACTIVITY

     
  • Further discussions on the preferred design option have been postponed until after the first of the year. 
  • 10/16/17 - City Hall - The City held a public meeting on Oct. 16th to receive community input and further discussion following the presentation of the seven bridge design concepts and various approach options. 
  • 09/28/17 - City Hall.  Review of preliminary site analysis and initial bridge design concepts.
  • 7/26/17 - City Hall.  The first of several meetings to hear community thoughts regarding the character of the bridge, etc. in an open forum and provide opportunities for more detailed discussions with the design team and city staff.

Select "NOTIFY ME" to subscribe to project notifications.

PRINT SCREEN

The City of Bainbridge Island fully complies with Title VI of the Civil Rights Act of 1964 and related statues in all programs and activities. Those requiring disability accommodations and/or materials made available in alternate formats, please contact the City Clerk at 206.842.2545 or cityclerk@bainbridgewa.gov.